Tocvan Drills 63.4-meters of 0.6 g/t Au and 11 g/t Ag, including 29.9-meters of 0.9 g/t Au and 18 g/t Ag at Pilar, Main Zone Extension.
Calgary, Alberta – May 27, 2022 Tocvan Ventures Corp. (the “Company”) (CSE: TOC; OTCQB: TCVNF; FSE: TV3), is pleased to announce drill results from its Pilar Au-Ag Project in Sonora, Mexico. Results for core drill holes JES-22-61 and JES-22-64 are provided in this release, both Main Zone extension targets infilling a gap and stepping out from holes JES-22-59 (116.9m at 1.2 g/t Au) and JES-22-62 (108.6m at 0.8 g/t Au) (see Figure 1). JES-22-61 returned 63.4-meters at 0.6 g/t Au and 11 g/t Ag, including 29.9-meters at 0.9 g/t Au and 18 g/t Ag. Within the broader mineralized interval, consistent gold mineralization was recorded within a silicified sulphide-bearing breccia returning 8.9-meters at 2.1 g/t Au, 45 g/t Ag and 6.1% Zn, the highest consistent base-metal mineralization drilled to date (see Plate 1). JES-22-64 was successful in intersecting a broad anomalous gold zone, indicating mineralization continues further to the southeast.
A total of 1,562 meters of Phase III drilling has been completed in nine drill holes providing key information across the Main Zone and 4-T Trend. Results for two drill holes are pending.
Drill Highlights
JES-22-61 (Core)
• 63.4m at 0.6 g/t Au and 11 g/t Ag, from 60.8m
o Including 29.9m at 0.9 g/t Au and 18 g/t Ag, from 60.8m
o Including 8.9m at 2.1 g/t Au, 45 g/t Ag and 6.1% Zn, from 81.8m
JES-22-64 (Core)
• 107.3m at 0.1 g/t Au, from 60.3m – Anomalous Zone on trend with JES-22-62
o Including 44.8m at 0.2 g/t Au, from 93.2m
“Drilling southeast of our Main Zone continues to return excellent gold and silver values in intensely silicified breccia-hosted mineralization.”, commented Brodie Sutherland, CEO. “Once again, the orientation of drilling has maximized success through this extension zone returning consistent values that warrant more drilling to fully evaluate the potential of the area. We are excited to evaluate the next steps at Pilar as we continue to move the project forward.”
Discussion of Results
As part of the Phase III program, nine drill holes have been completed totalling over 1,562 meters (Figure 1). Drilling looked to expand the Main Zone through 25, 50 and 100-meter step-outs to the southeast in a gap zone that has seen little drilling focused on the main trend between hole JES-20-32 (94.6m at 1.6 g/t Au) and hole JES-21-50 (39.7m at 0.96 g/t Au). Drilling also covered the 4-T Trend testing below trench T-21-3, which returned 19.5 meters at 0.61 g/t Au.
Drill hole JES-22-61 was successful in intersecting a significant zone of gold with broad mineralization in a silicified andesite host (63.4 meters of 0.6 g/t Au, including 29.9 meters of 0.9 g/t Au). The intersection included a silicified breccia zone grading 2.1 g/t Au, 45 g/t Ag and 6.1% Zn over 8.9 meters. This is the highest-grade base metal mineralization recorded to date. The broader low-grade interval correlates with mineralization in the Main Zone Trend, 85-meters southeast of JES-22-59 (116.9m of 1.2 g/t Au) and 50-meters northwest of JES-22-62 (108.6m of 0.8 g/t Au).
Drill hole JES-22-64, a 35-meter southeast step-out from JES-22-62, intersected a broad anomalous zone of 107.3-meters at 0.1 g/t Au. Mineralization looks to continue to the southeast, further drill testing along the trend will be required to confirm.
Results are pending for two holes on separate parallel trends.
View and Download Entire Release Here:
Powered By EmbedPress